The primary park has a capability of 200 MW though Sandrini II features a capability of one hundred MW. The overall expense of equally tasks were not disclosed having said that, through construction, in excess of 200 staff ended up utilized. The initiatives are predicted to check out A few https://californiasolarcompany.water.blog/2024/11/26/how-to-start-solar-energy-system-installation-with-a-california-solar-company/