Penmann has completed a complex HVAC upgrade at Nutricia’s Liverpool-based production site, providing a bespoke ventilation and climate control system built to comply with strict hygiene and production requirements. The contract covered the design, supply, installation and commissioning of high-specification HVAC systems across non-production, Medium Care (MC) and High Care https://socials360.com/story11230003/the-penmann-team-finalises-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-to-align-with-the-fsi-development-programme