Installation Overview At a prominent confectionery site in York, Newsome has installed a cutting-edge 400 kW chiller, marking the timely conclusion of the project. This initiative supports a substantial step forward in the client’s ESG framework, enhancing operational resilience and achieving measurable reductions in both energy consumption and carbon output. https://sparxsocial.com/story11231427/advanced-400-kw-chiller-installation-achieves-50k-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-cut